Service Application Form 2026

Enterprise & Carrier Account Enrollment, submitted online.

Complete the DSNi service application in one sitting — applicant details, services, technical profile, authorized contacts and documentary requirements. You will receive a reference number immediately and can track progress right through to activation.

8Service lines available
<10 minTypical completion time
RA 10173Data Privacy Act compliant
Section 2 of the form

Services you can apply for

Select any combination on the form. Pricing, one-time charges and service-specific terms are set out in the applicable Service Order and Service Level Agreement.

IP Transit

Full IPv4 + IPv6 BGP table, RPKI-validated, delivered on 1G, 10G or 100G handoff.

Dedicated Internet

Symmetric, unshared access with committed bandwidth and an SLA-backed availability target.

Domestic Leased Line

Point-to-point transparent transport between your sites, untagged, 802.1Q or QinQ.

MHK-IX Port

Peering ports on the Maharlika Internet Exchange for direct local traffic exchange.

Colocation

Rack, half-rack or per-U space with redundant power and cross-connects on request.

IPv4 Leasing

Clean, routable IPv4 space with IRR objects and ROAs prepared alongside the lease.

Dark Fibre

Unlit fibre pairs on our metro and provincial routes for full control of your optics.

Cloud / VPS

Locally hosted compute on our own infrastructure, adjacent to your transit.

How it works

From application to activation

Every application follows the same documented path, and the status you see when tracking is the same status our account team works from.

Submit the application

Eight sections, saved locally as you type. You receive a reference number on submission.

Review and site survey

We validate feasibility for routed, peering, colocation and transport services at the nominated site or node.

Documents and credit check

Submit the requirements listed opposite. Items marked mandatory are needed before installation.

Approval and provisioning

On written approval we issue the Service Order and execute the CSA, SLA and MCA, then schedule installation and turn-up.

Documentary requirements

To be submitted prior to installation. Items marked * are mandatory.

BIR Certificate of Registration (Form 2303) *
SEC Certificate of Incorporation or DTI Certificate of Business Name Registration *
Government-issued identification of the authorized signatory *
Board Resolution or Secretary's Certificate authorizing the signatory *
Mayor's Permit / Business Permit (current year) *
Latest General Information Sheet (GIS) — corporations only
Zero-Rating VAT Certificate (if applicable)
BIR Form 2307 arrangement confirmation (if a withholding agent)
Proof of billing address or lease contract for the service site
Building administrator clearance / work permit for on-premises installation (if applicable)
DSNi may request additional documents where required by law, by the building or facility owner, or by the applicant's credit profile. Completed forms and attachments may also be returned to info@dsnetworks.net.

Ready to connect?

Have your BIR 2303, SEC/DTI registration and signatory ID on hand — you can also upload them later against your reference number.

Open the application form